CLIENT: Department of Transport and Main Roads
VALUE: $1 million – $5 million
DURATION: NovĀ 2014 – Jun 2015
Shamrock Civil were contracted by Department of Transport and Main Roads to construct Stage 1B of the North Brisbane Bikeway between Federation Street and Somerset Street.
The project works consisted of:
- Demolition works;
- Earthworks including clearing and grubbing, subgrade treatments, excavation, backfilling and disposal;
- Supply and installation of stormwater structures;
- Grouted rock pitching and steel wire mattress protection;
- Concrete works including the supply and installation of kerb and channel, ramps, footpaths, driveways and traffic islands;
- Supply and installation of retaining walls, fencing, gates, bollards, handrails, landscaping turf and topsoil;
- Hand placement of over 5000m2 of concrete paving;
- Roadworks including 1000m3 of unbound pavements, prime and seal, linemarking and signage; and
- Supply and installation of electrical switchboards, road lighting cables, jointing pits and road lighting.