Client: Acciona Construction Australia

Shamrock has been engaged by Acciona to carry out the civil construction works at the Brisbane City Council Depot Access Road. The infrastructure Shamrock will construct is the link between the existing Busway and the proposed Metro Bus Development (ADCO).

Scope of Work includes:

  • Demolition of existing concrete barriers and the relocation of utilities in agreement with Brisbane Move and DTMR;
  • Removal and reinstatement of existing fencing
  • Earthworks and site level changes to accommodate proposed design for the access road;
  • Construction of new Concrete Barrier and Concrete Channels to tie-in to existing along Southeast Busway;
  • Construction of terminals for guardrail installation by others;
  • Formation of drainage berm behind barrier to tie-in to drainage channels from triple-cell culvert;
  • Construction of rip rap scour at culvert inlets;
  • Construction of kerbing to form a median on the access road; and
  • ┬áLandscaping and reinstatement of existing conditions
  • Installation of signage

Construction commenced late July and is estimated to be completed by late November.

Project Progress

Title

60%