Skip to main content

Gallipoli Barracks Road Works

Gallipoli Barracks

Road Works

Location

Enoggera, QLD

Client

Department of Defence (Aurecon)

Duration of Project

November 2019 – February 2020

Contract Value

$630,000

Shamrock Civil was awarded the project which involved the upgrade of the Jackson Road and Sadlier Street intersection within Gallipoli Barracks at Enoggera.

Scope of Work

  • Locate and pothole all existing underground & overhead services to confirm all depths, heights and locations
  • Removal of 14 existing trees on the northern side of Jackson Road and new replacement planting at a ratio of 1:10 (1 removed: 10 replaced)
  • Excavation of earth, kerb, footpath, and vegetation that fall within thewidening section
  • Excavation, treatment and disposal of PFAS contaminated spoil
  • Construction of 2 new pavements: rigid (reinforced concrete) & flexible (gravel and asphalt surfacing)
– 182m2 double reinforced 250mm 40Mpa
– 152m2 flexible pavement including 200mm 2.5 Road base, 165mm2.3 Road base, 150mm Type 2.1 Road base & 50mm Asphalt
  • Construction of new pavement drainage including subsurface drainage, kerb & channel, storm water gully pit and manhole
  • Construction of new footpath, pram ramps and turfed verge
  • Relocate existing fire hydrant and remove existing watermain valve to facilitate new road widening
  • Relocate existing signage and installation of new signage and pavement linemarking

Project Complications & Achievements

Shamrock Civil developed a comprehensive staging plan which enabled 90% of the works to be completed without traffic control or lane closures and therefore minimised disturbance to Defence operations. Shamrock Civil assisted the designers by surveying unknown inground services and created a 3D model to assist in clash analysis and design review to accommodate the unknown services.