<?xml version="1.0"?>
<oembed><version>1.0</version><provider_name>Shamrock Civil</provider_name><provider_url>https://shamrockcivil.com.au</provider_url><author_name>shamrock</author_name><author_url>https://shamrockcivil.com.au/author/shamrock/</author_url><title>WIDE BAY WASH BAYS AND CIVIL WORKS - Shamrock Civil</title><type>rich</type><width>600</width><height>338</height><html>&lt;blockquote class="wp-embedded-content"&gt;&lt;a href="https://shamrockcivil.com.au/portfolio/wide-bay-wash-bays-and-civil-works/"&gt;WIDE BAY WASH BAYS AND CIVIL WORKS&lt;/a&gt;&lt;/blockquote&gt;
&lt;script type='text/javascript'&gt;
&lt;!--//--&gt;&lt;![CDATA[//&gt;&lt;!--
		/*! This file is auto-generated */
		!function(d,l){"use strict";var e=!1,o=!1;if(l.querySelector)if(d.addEventListener)e=!0;if(d.wp=d.wp||{},!d.wp.receiveEmbedMessage)if(d.wp.receiveEmbedMessage=function(e){var t=e.data;if(t)if(t.secret||t.message||t.value)if(!/[^a-zA-Z0-9]/.test(t.secret)){var r,a,i,s,n,o=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),c=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]');for(r=0;r&lt;c.length;r++)c[r].style.display="none";for(r=0;r&lt;o.length;r++)if(a=o[r],e.source===a.contentWindow){if(a.removeAttribute("style"),"height"===t.message){if(1e3&lt;(i=parseInt(t.value,10)))i=1e3;else if(~~i&lt;200)i=200;a.height=i}if("link"===t.message)if(s=l.createElement("a"),n=l.createElement("a"),s.href=a.getAttribute("src"),n.href=t.value,n.host===s.host)if(l.activeElement===a)d.top.location.href=t.value}}},e)d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",t,!1),d.addEventListener("load",t,!1);function t(){if(!o){o=!0;var e,t,r,a,i=-1!==navigator.appVersion.indexOf("MSIE 10"),s=!!navigator.userAgent.match(/Trident.*rv:11\./),n=l.querySelectorAll("iframe.wp-embedded-content");for(t=0;t&lt;n.length;t++){if(!(r=n[t]).getAttribute("data-secret"))a=Math.random().toString(36).substr(2,10),r.src+="#?secret="+a,r.setAttribute("data-secret",a);if(i||s)(e=r.cloneNode(!0)).removeAttribute("security"),r.parentNode.replaceChild(e,r)}}}}(window,document);
//--&gt;&lt;!]]&gt;
&lt;/script&gt;&lt;iframe sandbox="allow-scripts" security="restricted" src="https://shamrockcivil.com.au/portfolio/wide-bay-wash-bays-and-civil-works/embed/" width="600" height="338" title="&#x201C;WIDE BAY WASH BAYS AND CIVIL WORKS&#x201D; &#x2014; Shamrock Civil" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&gt;&lt;/iframe&gt;</html><thumbnail_url>https://shamrockcivil.com.au/wp-content/uploads/2019/12/IMG_8979_feature.jpg</thumbnail_url><thumbnail_width>600</thumbnail_width><thumbnail_height>400</thumbnail_height><description>Shamrock Civil Engineering was awarded the contract to deliver the new accessroute for the APC and to repair the collection and treatment of the stormwaterrunoff at the existing wash bay within Camp Kerr Wide Bay Training Area. Thiswas an environmentally sensitive project with endangered plants and vulnerablewildlife inhabiting the area. Surveys of the area were conducted beforeconstruction activities to protect populations in the vicinity.</description></oembed>
