Camperdown
Biosolids Facility Refurbishment
Location
Camperdown VIC
Client
Wannon Region Water Corporation
Duration of Project
October 2019 – April 2020
Contract Value
$3 Million
Shamrock Civil Engineering was awarded the contract to refurbish the existing biosolids drying and stockpiling area at the existing water reclamation plant (WRP) in Camperdown, Victoria.
Scope of Work
-
Stripping of stockpile site of vegetation and topsoil
-
Removal of fencing
-
Preparation of access roads to the stockpile site for material importation
-
Stripping of existing biosolids area floor of biosolids and silts including separation of rock from biosolids, stockpiling of biosolids
-
Cut biosolids area to provide 600mm clay depth to finished surface level
-
Filling, forming, compacting and grading of clay liner to design profile using imported and stockpiled clay fill
-
Filling, forming, compacting and grading of 250 mm stabilised wear layer to design profile using cement and lime stabilised clay
-
Refurbishment of access roads and re-profile catch drain
-
Concrete tipping point structure upgrade of site roads and site infrastructure
-
40,000m2 of stabilized lime and cement to create wear layer for site operation