Duration of Project
September 2014 – April 2015
Contract Value
$3 Million
Shamrock Civil Engineering were engaged by QGC Pty Ltd (QGC) to undertake the Kenya large pond upstream embankment remediation project and upgrade of the Jen 2/Janda pond, Kenya East pond and the Ruby Jo pond, in Chinchilla, QLD.
Scope of Work
-
Supply and application of fertiliser, organic matter, grass seeding and placement of Vetiver grass
-
Construction of earth bunds and grade channels to fall to outlets
-
Topsoil treatment including gypsum treatment, fertiliser, pre-watering and hydro-mulching to external embankments
-
Remediation of erosion and reinstatement of riprap protection including supply and placement of 300mm thick riprap and cushion geo-textile at outlets and rock chutes
-
Remediation of erosion pond down stream embankments and diversion drains
-
Subgrade surface preparation for Coletanche Liner at Kenya Large Pond
-
Excavation of anchor trench along crest, installation of Coletanche liner,backfill and compact
-
Supply and installation of Elcorock bags filled with non-dispersive soil
-
Reinstatement of capping material including supply and installation of200mm thick on the crest of the embankment
-
Site reinstatement and revegetation of areas disturbed