Land 154
DSTG Edinburgh
Location
Edinburgh SA
Client
St Hilliers
Duration of Project
November 2020 – May 2021
Contract Value
$280k
The LAND 154 project involved the demolition of redundant infrastructure, realignment of the existing swale by means of cut and fill, construction of pavements to underside of concrete, installation of drainage pits and stormwater infrastructure.
Scope of Work
-
Cut to fill – 950 m3
-
Cut to stockpile – 700 m3
-
Detailed excavation – approx. 50 m3
-
300mm PVC Stormwater line – approx. 180m
-
100mm PVC Stormwater line – approx. 40m
-
5 x Drainage pits
-
3 x Precast concrete headwalls
-
Hardstand required for heavy duty concrete pavement. 300mm of PM2/20 was placed on a prepared subgrade and handed over to the concrete subcontractor to complete works